Date Completed: 2023
Scope: Performance Assestment
Timeframe: 1 month
About this Project: Installation, testing, inspection, identification, isolation, system restart, recording.

SVI PROJECT

Scaffolding and panel lifting rail installation and testing, inspection of panel breakage location, identification and isolation of the system's cause, system restart, and recording of solar-generated load every 15 minutes, resulting in the system returning to normal operation without tripping.