Date Completed: 2023
Scope: Installation Services
Timeframe: 1 Month
About this Project: Aeon Logi Plus inspection: Tasks completed include grounding box installation, painting rusted mounting rails, tightening bolts, and labeling cables and inverters.

Objective

Project In AEON LOGI PLUS initial inspection

During our site inspection at AEON logi plus the team cleaned solar panels, tightened loose clamps, added grounding lugs to the grounding cable, monitored and test the inverter temperature during operation.
Upon inspection Single line diagram must be installed in the PVDB, and verified energy meter recording during grid cutoff and generator operation, with corresponding recommendations for each action.

 


On August 19, 2023, an inspection of Aeon Logi Plus revealed the completion of several tasks, including the installation of grounding boxes, painting of rusted mounting rails, the creation and tightening of bolts and clamps on the rooftop, along with the installation of grounding boxes, shrinkable tubes, and labels for the main cable and inverter inside the warehouse.